Customise Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyse the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customised advertisements based on the pages you visited previously and to analyse the effectiveness of the ad campaigns.

No cookies to display.

Thalia Mara Hall Updates – Week 9  

Thalia Mara Hall

The Thalia Mara Hall remediation project has begun. We will continue to publish updates every Thursday as additional developments are made.  

 The following progress has been made since the start of remediation: 

  • Equipment Arrival: All necessary equipment and supplies are now on site.
  • Climate Control: Temporary climate control systems have been installed and are operational.
  • Safety Measures: Protective safety measures have been established throughout the facility.
  • Air Quality Control: Air quality systems are active in most areas to ensure a safe environment.
  • Asbestos Removal Permit: The required permit for asbestos removal has been approved.
  • Basement Cleaning: 80% of the basement contents have been cleaned.
  • Structural Cleaning: Half of the structural cleaning in the basement is complete.
  • Installation Equipment: Aerial lifts have arrived, and 70% of the scaffolding has been set up.
  • Rigging Analysis: The rigging inspection report has been received, response determination in progress
  • Roofing Inspection: A roofing inspection and planned repairs are running concurrent to the remediation process 


Next Steps: 

  1. Remediation and repair schedule will continue, progress will be reflected in these updates. 

  

Previous Updates:  

Week 1 (9/12/24): Week 1
Week 2 (9/19/24): Week 2
Week 3 (9/26/24): Week 3
Week 4 (10/3/24): Week 4
Week 5 (10/10/24): Week 5
Week 6 (10/18/24): Week 6
Week 7 (10/24): Week 7
Week 8 (10/31/24): N/A – Progress Continues